Is a research group performing well because it publishes many papers, secures more grants or meets every deadline? The answer depends on its mission, the stage of its research and the resources available to it. A group may publish less in one quarter because it is building research infrastructure, preparing a competitive grant application or undertaking complex experimental work. Equally, it might increase its publication count while failing to address delays affecting doctoral researchers and ongoing projects.
Research output indicators help turn this diverse activity into information that supports decisions. When properly defined, they allow a principal investigator (PI) to keep track of publications, funding, projects, doctoral research and team capacity. When misused, they turn research into a race to increase figures that do not necessarily reflect its value.
This guide explains seven key performance indicators (KPIs) for research groups, including formulas, numerical examples and limitations. It also shows how to build a research performance dashboard that improves day-to-day management without replacing expert scientific judgement.
What are research output indicators, and what are they used for?
Research output indicators are measures describing particular aspects of a research team's activities, processes, outputs or use of resources. They may express absolute quantities, such as the number of publications released during a year; proportions, such as successful grant applications among applications with a decision; or monitoring information, such as doctoral milestones awaiting validation.
A KPI (key performance indicator) is a measure chosen because it is relevant to a management objective. Not every available metric deserves to become a KPI. A PI should be able to explain what decision would change if a given indicator improved, deteriorated or remained stable.
“We published six papers” is an activity statistic. “Five manuscripts in our editorial pipeline are waiting for internal review” may point to a practical decision: allocating co-authors' time to unblock them. The number alone matters less than the action it can help justify.
Research output, productivity, management performance and impact are not the same
| Concept | What it describes | Example |
|---|---|---|
| Research output | Outputs produced and disseminated | Articles, books, datasets, software, reports and prototypes |
| Productivity | The relationship between outputs and resources used, where that comparison is meaningful | Outputs interpreted in the context of team size, roles and time period |
| Management performance | Fulfilment of commitments and effectiveness of processes | Milestones completed on time or applications submitted correctly |
| Scientific or societal impact | The contributions and effects of outputs in their particular context | Dataset reuse, influence on practice, scientific advances or knowledge transfer |
This distinction matters: counting articles is not the same as assessing scientific impact. Nor is it fair to compare a five-person group directly with a thirty-person team, or a field where scholarly monographs are common with one where journal articles dominate.
The OECD's Frascati Manual provides a statistical framework for measuring R&D resources and activities. It should not be mistaken for a universal system for judging the scientific quality of every research group.
How to choose research group KPIs without measuring everything
Before calculating R&D performance metrics, define the objective and observation period. You might want to identify delays in doctoral projects, improve proposal preparation, monitor the commitments of a funded project or understand the status of published work. An operational dashboard may be reviewed monthly; scientific outputs often require six-month, annual or multi-year windows.
- Objective: what management question the KPI answers and which decision it could inform.
- Unit of analysis: research group, research line, project, funding call or thesis; avoid mixing levels.
- Precise definition: numerator, denominator, dates, included statuses and exclusions.
- Verifiable source: project register, grant decision, DOI, doctoral report or documentary evidence.
- Owner and frequency: who maintains the measure and when it is reviewed.
- Context: team size, discipline, career stage, reliance on external decisions and limitations.
A useful rule is to avoid universal percentage targets without examining the group's track record and constraints. A 40% success rate in a highly competitive funding scheme means something different from the same rate in an internal programme. A quarter without publications may be perfectly normal for a long-term research project.
Seven useful research KPIs at a glance
| KPI | What it helps you understand | Suggested review |
|---|---|---|
| 1. Grant application success rate | Outcomes of applications that have received a decision | Every six or twelve months |
| 2. Publications by quarter and journal quartile | Published output and its bibliometric context | Quarterly, with an annual trend |
| 3. Competitive research funding awarded | External resources secured and where they come from | Quarterly and annually |
| 4. Project milestones completed on time | Commitments progressing as planned or falling behind | Monthly |
| 5. Doctoral research milestones | Progress through agreed stages and deliverables | Monthly or quarterly |
| 6. Validated research deliverables | Outputs beyond journal articles | Quarterly |
| 7. Committed research capacity | Risk of over-allocating people and specialist skills | Monthly |
KPI 1. Research grant application success rate
The grant application success rate indicates the proportion of applications with a completed funding decision that were successful. It can help review submission strategy, fit with eligibility criteria and the selection of opportunities worth pursuing.
Working formula: (number of successful applications ÷ number of applications with a final decision) × 100.
| Status | Applications | Treatment |
|---|---|---|
| Awarded | 2 | Included in numerator and denominator |
| Unsuccessful | 3 | Included in denominator |
| Awaiting a decision | 4 | Reported separately, excluded from calculation |
The result is 2 ÷ 5 × 100 = 40%. Including the four pending applications would make the rate artificially lower. Teams should also agree how to handle withdrawn or ineligible applications, collaborative bids, partial awards and resubmissions.
Do not mix application cohorts and funding schemes
There are two legitimate ways to group results, but they should not be confused: group applications by year of submission and follow them through to a decision, or group them by decision date. The first helps analyse application cohorts; the second shows decisions received within a particular reporting period. Choose an approach, document it and identify outstanding applications.
The rate alone does not tell you which grants to pursue. Segment it by funding body, funding mechanism, application size and whether the group acts as coordinator or partner. Published funder success rates use their own definitions and should not be compared with a group's figures without checking the methodology. For example, Spain's State Research Agency publishes programme-level analyses illustrating why this context matters.
KPI 2. Q1 and Q2 journal publications per quarter
This indicator combines two pieces of information: how many papers were published during a period and the journal's quartile in a specified bibliometric ranking. It can help track publication patterns, especially in disciplines where indexed journals are a common means of disseminating research.
Recommended measures: total articles published in the quarter; number published in Q1 journals; number in Q2; number in other quartiles; and number with no applicable or verified quartile. If you report a Q1+Q2 percentage, explicitly state the denominator and which publications have been excluded.
| Reported classification | Articles |
|---|---|
| Q1 | 4 |
| Q2 | 1 |
| Q3 / Q4 | 1 |
| Quartile not verified | 0 |
| Total published | 6 |
In this example, the group published six articles, five of them in journals classified Q1 or Q2 under the source and reference year chosen by the group. This does not establish that those five papers are scientifically better than the sixth.
Q1 and Q2: which ranking, category and year should you use?
Quartiles rank journals within subject categories. They do not establish the quality of an individual article or the merit of its authors. In Journal Citation Reports (JCR), Journal Impact Factor (JIF) quartiles depend on a journal's ranking by impact factor within a category. SCImago uses the SCImago Journal Rank (SJR) indicator instead. Rankings can therefore differ between providers, subjects and years.
To avoid misleading comparisons, retain the source, subject category, reference year, quartile and DOI for each publication when available. A journal may belong to several categories and have different quartiles in each. Adopt a consistent rule for these cases rather than switching between JCR and SJR whenever one gives a more favourable result.
Keep acceptance dates, online publication dates and final publication dates distinct. The Crossref REST API can help retrieve DOI-linked metadata, subject to what publishers have deposited.
The San Francisco Declaration on Research Assessment (DORA) advises against using journal-level metrics, such as the Journal Impact Factor, as substitutes for the quality of individual articles or researchers' contributions. Q1/Q2 counts should therefore be treated as descriptive, contextual data rather than automatic quality scores.
For the stages preceding publication, see our guide to scientific publication management and peer review workflows.
KPI 3. Competitive research funding awarded to the group
In addition to knowing how many proposals succeed, a PI needs to distinguish funding requested, awarded, committed, received and spent. These are different amounts. A €200,000 award does not mean that the entire sum is immediately available, or that the funds can be transferred freely between projects.
Basic calculation: add up competitive funding amounts awarded to the group during the reporting period, as documented in funding decisions or agreements. For consortium projects, record the share attributable to the group or institution, rather than automatically using the entire consortium budget.
For example, if one proposal secures €180,000 for the group and another €100,000, the period's awarded funding KPI is €280,000. This differs from cash actually received and expenditure incurred.
Information that should accompany awarded funding
- Source of funds: European, national and regional programmes, foundations or internal schemes, with competitive awards identified separately.
- Conditions and duration: dates, eligible costs, reporting requirements, co-funding and contractual obligations.
- Actual involvement: coordinator, beneficiary, partner or subcontractor, with the correct amount allocated to the group.
- Concentration: reliance on one funding body or programme and the potential consequences of interrupted funding.
This KPI describes funding secured and how it changes over time, but it is not the group's financial profit. Research awards can cover substantial costs and carry strict spending conditions. Maintaining a dedicated register of funding calls helps teams coordinate opportunities, award decisions and reporting dates.
KPI 4. Percentage of project milestones completed on time
A group can have funding and strong publication output while still accumulating overdue deliverables that jeopardise reports, agreements or later experiments. The on-time milestone completion rate makes visible the delivery of commitments with agreed deadlines.
Formula: (milestones scheduled to fall due during the period and completed no later than their committed due date ÷ all milestones scheduled to fall due during the period) × 100.
Suppose 15 milestones were due during the quarter: 12 were completed on time, two were completed late and one is still pending. The on-time completion rate is 12 ÷ 15 × 100 = 80%. The pending milestone remains in the denominator; removing it would create an artificially positive impression.
How to handle rescheduled milestones and external dependencies
A milestone may slip because of ethics approval, equipment delivery, a funder's decision or an experimental result that calls for a methodological change. Record the original due date, current agreed date, reason for the change and person who approved the revised plan. Replacing the original date without keeping a history hides the actual delays.
Distinguish contractual milestones, internal scientific milestones and routine tasks. Treating every small task as equal to a funded deliverable may produce an excellent-looking indicator that is of little use to project leadership.
Complement this KPI with a review of outstanding critical milestones and risks, not a league table of who “performs best”. You can explore the approach further in our guide to R&D project management.
KPI 5. Doctoral thesis milestone completion rate
For groups supervising doctoral candidates, monitoring should extend beyond the number of theses defended. Doctoral research involves planning, investigation, analysis, writing, assessment and administrative requirements, with progress depending on doctoral researchers, supervisors, committees and institutional rules.
Suggested formula: (doctoral milestones due within the reporting period and validated by the agreed deadline ÷ doctoral milestones due within the reporting period) × 100.
Fictional example: eight previously agreed milestones across several theses were due during a quarter, and six were validated on time. The result is 6 ÷ 8 × 100 = 75%. This suggests two situations need attention; it does not establish that the doctoral researchers concerned are conducting worse research.
Which doctoral milestones are worth tracking?
- Research plan: submission, approval and updates required by the doctoral school.
- Scientific progress: experiments, fieldwork, corpora, analysis or thesis chapters, depending on discipline.
- Formal monitoring: reports, supervisory meetings, annual reviews and applicable approvals.
- Preparing for the defence: final draft, supervisor review, thesis submission and administrative requirements.
Not every thesis follows the same stages, and institutional doctoral regulations take precedence over internal templates. Interpret this KPI particularly carefully where there is approved leave, a change in methodology, justified interruptions or personal circumstances. It should support supervision and planning, not pressure doctoral candidates.
To organise relationships among doctoral researchers, supervisors, projects and deliverables, see our doctoral thesis management features.
KPI 6. Validated research deliverables and outputs
A group's research output goes beyond indexed journal papers. Depending on the field, it can also produce datasets, protocols, software, text corpora, technical reports, models, instruments, specialised teaching resources, patents where relevant, or prototypes. When a dashboard only covers journal articles, much of this contribution may disappear from management discussions.
One practical measure is the completion rate for planned and accepted research deliverables, provided they were defined before the reporting period and have clear validation criteria.
Formula: (deliverables planned to fall due during the period and validated against agreed criteria ÷ all deliverables planned to fall due during the period) × 100.
Example: out of nine non-publication deliverables due in the quarter, including datasets, protocols, prototypes and reports, seven were completed and validated. The KPI is 7 ÷ 9 × 100 ≈ 77.8%.
Avoid double-counting research outputs
A dataset may be linked to two projects and underpin three articles. Counting that same dataset as three separate outputs inflates the inventory. Use persistent identifiers where they exist, preserve links to each project and distinguish unique outputs from contributions to multiple activities.
Do not simply add “one patent + one dataset + one report” as though they were equivalent contributions. It is more informative to show the proportion of commitments completed, break outputs down by type and supplement the figures with qualitative evidence of relevance and reuse.
This approach is consistent with CoARA's research assessment principles, which encourage recognition of diverse contributions and place qualitative judgement at the centre, supported by responsible use of quantitative indicators.
KPI 7. Committed research capacity across the team
A PI needs to know whether the pipeline of projects and proposals is feasible with the time available. A laboratory might have five apparently workable project schedules, but all five may need the same technician in the same month. Research workload is therefore a preventive management measure, not a measure of individual talent.
Suggested formula: (full-time equivalents —FTEs— committed to research activities during the period ÷ FTEs actually available for those activities) × 100.
For example, if effective availability is 5.0 FTEs and scheduled commitments total 4.8 FTEs, planned capacity utilisation is 96%. This does not prove that the schedule is sustainable: it may conceal an overcommitted specialist or leave too little slack for unexpected events.
Why capacity needs to be assessed by role and period
An overall 96% figure could coexist with 120% utilisation for specialists in one technique and 70% for another, non-interchangeable role. Break down capacity by critical skills, weeks or months, contracted availability, teaching, supervision, administrative duties and planned absences where relevant. Total working hours are not the same as time actually available for research.
This KPI helps teams negotiate priorities, postpone work or arrange support before problems escalate. Using individual utilisation percentages to police personal productivity would be methodologically weak and could undermine trust.
Example research performance dashboard with seven KPIs
Imagine a university research group with active projects, early-career researchers and several competitive funding applications. The dashboard below uses entirely fictional data. It illustrates how to present definitions, reporting periods and signals that deserve discussion; the values are not universal benchmarks.
| Indicator | Illustrative result | Interpretation and question for the PI |
|---|---|---|
| Grant application success rate | 40% (2/5 decided) | Which funding programmes or mechanisms account for differences? |
| Publications and journal quartiles | 6 papers; 4 Q1, 1 Q2, 1 Q3/Q4 | How is the manuscript pipeline evolving, and which ranking criteria were used? |
| Funding awarded | €280,000 | What share belongs to the group, and which restrictions apply? |
| Project milestones | 80% (12/15 on time) | Which three commitments need attention? |
| Doctoral milestones | 75% (6/8 on time) | What support or changes to the plan are required? |
| Non-publication deliverables | 77.8% (7/9 validated) | What evidence is missing, and which deliverables remain open? |
| Committed capacity | 96% (4.8/5.0 FTEs) | Are there bottlenecks by speciality or month? |
The dashboard becomes more useful when each row displays a current value, historical series, trend, data owner and link to supporting detail. Traffic-light indicators can flag exceptions, but thresholds should be agreed separately for each measure rather than borrowed from generic percentages with no context.
Where the figures come from and how to preserve traceability
| Source | Minimum records | Verification |
|---|---|---|
| Funding calls | Identifier, funding body, status, decision date, amount awarded | Official award notice or funder's communication |
| Publications | DOI, title, publication date, journal, ranking source/category/year | Publisher record and identifiable bibliometric source |
| Projects | Milestone, original due date, current date, owner, status, evidence | Minutes, deliverable or authorised validation |
| Doctoral research | Stage, milestone, agreed date, status and validation | Supervision agreement and doctoral regulations |
| Capacity | People, roles, availability, planned allocation and reporting period | Reviewed and updated resource plan |
Where possible, each publication, thesis or funding application should have one reusable master record rather than multiple spreadsheet copies. That makes status changes traceable and helps prevent inconsistent reports.
How to interpret research metrics without ranking individual researchers
A KPI dashboard can support project leadership, but it can also create harmful incentives when used to compare people, fields or career stages without context. The Leiden Manifesto, DORA's guidance on indicators and the CoARA agreement emphasise, in different ways, context, transparency and qualitative assessment.
- Do not treat Q1 or Q2 as a synonym for individual quality: a quartile describes a journal in a specified category and reference year.
- Do not treat meeting deadlines as a judgement of people: record underlying causes, dependencies, approved changes and working circumstances.
- Do not compare disciplines using raw counts: publishing timescales, output formats and citation practices differ.
- Do not hide negative results: a rigorous experiment that disproves a hypothesis can produce valuable knowledge.
- Do not reduce impact to counts: reused datasets, improved clinical practices, maintained software or policy advice may require qualitative evidence.
- Document the dashboard's purpose: collective management, resource planning and process improvement, rather than individual surveillance.
In a university department or research and technology organisation, an operational dashboard and formal research assessment may share data, but their purposes and methods should not be conflated. If metrics are used for promotion, hiring or funding decisions, appropriate evaluation criteria, transparency and additional safeguards are essential.
How to introduce a research KPI dashboard: a practical plan
You do not need to begin with dozens of metrics or a complex platform. A small group can test definitions and review meetings using a shared spreadsheet. As records, stakeholders and dependencies multiply, an integrated system can reduce the time spent consolidating data manually.
- 01
Agree on three priority decisions
ObjectivesExamples include anticipating deadlines, knowing the actual status of grant applications and preventing overload. Start with indicators that help answer these questions.
- 02
Create a data dictionary for each indicator
DefinitionsRecord the formula, source, unit, owner, period and edge cases for every KPI: changed deadlines, pending statuses, publications without DOIs and shared projects.
- 03
Clean the initial dataset
Data qualityDeduplicate outputs, separate consortium budgets from funds attributable to the group, verify journal quartiles and review milestones with outdated dates.
- 04
Review KPIs with the team
MonitoringUse a monthly meeting to discuss bottlenecks and commitments. Reserve quarterly reviews for publication trends, funding and structural decisions.
- 05
Improve the dashboard based on usefulness
RefinementIf an indicator takes substantial effort to calculate but never changes a decision, simplify it or retire it. Preserve historical definitions so that comparisons remain meaningful.
How KaiperKit fits into research activity monitoring
KaiperKit helps organise research lines, R&D projects, scientific publications, doctoral theses, funding calls, tasks, milestones and related documents within workspaces. This structure can make it easier to collect monitoring information and prepare reports on a research group's activities.
That does not mean the platform automatically calculates every formula, journal ranking, FTE allocation or dashboard visualisation described here. Check the capabilities available and the underlying data sources before planning a complete institutional reporting system.
For teams managing multiple research lines or units, the discussion of indicators also connects to research project portfolio management (PPM). Group KPIs describe activity and execution; PPM focuses on decisions about the combination of projects and resources across the wider organisation.
Seven mistakes to avoid when measuring research output
- Confusing acceptance with publication: an accepted manuscript may not yet have been published; choose a consistent reference date.
- Counting pending applications as unsuccessful: this distorts the grant success rate.
- Mixing JCR and SJR without disclosure: it produces quartile trends that are not comparable.
- Overwriting historical milestone dates: this conceals replanning and destroys the original timeline.
- Double-counting shared outputs: a publication linked to several projects should still be identifiable as one unique output.
- Confusing awarded funding with cash available: award decisions, payments and expenditure occur at different times.
- Comparing researchers only through counts: this ignores roles, disciplines, career stages, workloads and the quality of their work.
Frequently asked questions about research output indicators and KPIs
What are the main KPIs for a research group?
They depend on the group's goals. A useful operational set can include grant success rates, publications by period and bibliometric context, funding awarded, project and doctoral milestone completion, diverse research outputs and the team's committed capacity.
How do you measure a research group's scientific output?
First define which types of outputs belong in the register and the reporting period. Then count verifiable, unique outputs, distinguishing articles, books, datasets, software and other products. There is no universal formula that reduces all research output and its quality to a single number.
What is a research performance dashboard?
It is a consolidated view of indicators and statuses used to make decisions about research activity: grant applications, publications, projects, doctoral research, outputs and resources. It should show where each figure comes from and enable users to investigate exceptions.
Does publishing in a Q1 journal mean a paper is scientifically better?
Not necessarily. Q1 describes a journal's position in a specific ranking and subject category. Assessing an article requires examining its content, rigour and contribution, rather than relying on the journal's metric alone.
How often should research KPIs be reviewed?
Operational commitments and team workload may be reviewed monthly; publications and deliverables quarterly; and grant funding results over six-month or annual windows as well. Review frequency should match the pace of the process and the availability of reliable data.
Should pending grant applications be included in the success rate?
Not if the chosen formula uses applications with final decisions as its denominator. Report pending applications separately. When analysing cohorts by year of submission, also state how many have not yet received a decision.
How can you measure doctoral progress without disadvantaging candidates?
Use agreed milestones, transparent criteria, qualitative supervision and reviews of bottlenecks and dependencies, respecting institutional regulations and justified circumstances. The length of a doctorate or the number of papers should not become an automatic ranking of doctoral researchers.
Can a research KPI dashboard be created in Excel?
Yes. A structured spreadsheet may be sufficient for a small group. Specialist software becomes more useful when several teams share data, statuses change frequently or relationships and access permissions are needed across projects, doctoral theses, publications and funding calls.
Measure research to improve it, not to reduce it to numbers
The best research output indicators help PIs and teams anticipate problems, explain decisions and understand results in context. A consistent grant success rate, a reliable publication register, awarded funding, project and doctoral milestones, diverse outputs and available capacity provide a more useful picture than any single productivity score.
A dashboard should support discussion: what happened, why it happened, what depends on third parties and what action might improve the next reporting period. Scientific assessment still requires expert judgement; indicators should be transparent, responsible and adapted to each discipline.
Sources and further reading
The numerical examples and operational definitions in this article are illustrative and should be adapted to each organisation's objectives and requirements.
- DORA — Guidance on the responsible use of quantitative indicators in research assessment (2024).
- CoARA — Agreement on Reforming Research Assessment.
- Hicks et al. — The Leiden Manifesto for research metrics (Nature, 2015).
- OECD — Frascati Manual 2015, English edition.
- Clarivate — Journal Citation Reports: metrics and quartiles.
- SCImago — Journal quartiles in research evaluation.
- Spanish State Research Agency — PID2023 Knowledge Generation Projects indicators (Spanish).
- Crossref — REST API and publication metadata.