Technical guide · European grant management · 2026
Horizon Europe project reporting and justification are not simply a matter of handing in a scientific report and a spreadsheet of expenditure at the end of a project. They involve ongoing monitoring in which research activities, staff effort, declared costs, deliverables and contractual documentation must tell a consistent, verifiable story.
A team may achieve its scientific objectives and still encounter problems during financial reporting: unapproved time records, purchases with insufficient supporting documents, costs charged outside the eligible period, or inconsistencies between declared expenditure and the work packages actually implemented. The reverse can also happen: the accounts reconcile, but the deliverables or explanations of delays do not adequately demonstrate technical progress.
This guide explains how to prepare Horizon Europe technical and financial reporting step by step, which evidence to retain, how to manage timesheets and declarations of days worked, how to calculate direct and indirect costs, when a Certificate on the Financial Statements (CFS) is required, and how to organise a pre-audit. It includes worked examples, control tables and an operating model adaptable to universities, technology centres, hospitals and R&D institutions.
- The Grant Agreement takes precedence. Reporting dates, commitments and many exceptions are established in the signed agreement and its annexes, not in a generic template.
- There are two reporting streams. Continuous reporting of results and deliverables runs alongside periodic technical and financial reports.
- Personnel costs need reliable evidence. Under actual-cost grants, monthly declarations of day-equivalents or reliable alternative time-recording systems are used, subject to the applicable rules.
- Indirect costs are generally calculated at 25% of a defined eligible direct-cost base that excludes certain categories.
- Not every grant is reported in the same way. Lump-sum funding does not require reporting the project's actual costs for payment purposes as a traditional actual-cost grant does.
1. What is Horizon Europe project reporting and what is checked?
Grant reporting encompasses the monitoring, communication and record-retention obligations used to verify that an EU-funded project is implemented in accordance with its grant agreement. In Horizon Europe—the European Union's research and innovation framework programme for 2021–2027—those obligations cover technical, financial, contractual and compliance matters.
Horizon Europe technical reporting answers questions such as: Have the agreed activities been carried out? What outputs and deliverables exist? Which milestones have been achieved? What risks or changes have arisen? What impact is being generated? Financial reporting asks: Are the costs eligible? Do they relate to the beneficiary and the project? Have they been calculated correctly? Is there an adequate audit trail?
The granting authority may examine both dimensions. The fact that an expense has been paid does not make it eligible: it must satisfy the applicable conditions. Equally, stating that an experiment was completed is not enough: technical evidence must support the claim and align with the agreed work.
Key principle: sound reporting is not drafted from scratch at the end of a reporting period. It is built throughout implementation by linking tasks, deliverables, owners, effort, invoices and decisions.
2. First, identify whether your grant uses actual costs or lump-sum funding
Before setting up timesheet templates or cost spreadsheets, confirm the type of grant and applicable rules. Horizon Europe includes different funding forms. The two most relevant to this guide are traditional grants based on eligible actual costs and lump-sum grants.
| Aspect | Actual costs / permitted cost forms | Lump sum |
|---|---|---|
| Basis of the EU contribution | Eligible costs or units declared under the Grant Agreement. | Amounts fixed for the agreed work packages and activities. |
| Financial information during implementation | Financial statements and information on resources used are submitted where applicable. | Acceptance of the work performed and completion of work packages determine payment. |
| Timesheets and payroll records to substantiate actual costs to the EU | Relevant evidence supporting declared personnel costs. | No general contractual obligation to keep actual-cost records to justify the lump-sum amount; other obligations may still apply. |
| Technical monitoring | Milestones, deliverables, results, risks and compliance. | Milestones, deliverables and, particularly, evidence of work completed under each WP. |
| Certificate on the Financial Statements (CFS) | May be required if the applicable conditions and threshold are met. | No CFS is submitted to substantiate actual costs under a lump-sum grant. |
This distinction is crucial. Applying an actual-cost procedure indiscriminately to a lump-sum grant adds bureaucracy without addressing the principal condition for payment. Applying lump-sum assumptions to an actual-cost grant may leave essential financial evidence missing from the file.
Some actions, including certain Marie Skłodowska-Curie Actions (MSCA), also operate under specific unit-cost rules and conditions. Procedures must therefore be checked against the relevant call and signed agreement. The European Commission provides dedicated guidance on lump-sum funding.
3. The documents governing reporting: GA, Annex 1, Annex 2 and AGA
One of the costliest errors is to follow generic rules without checking the signed grant file. Each project should have a controlled contractual folder containing the following documents:
| Document | Purpose | What to check before each reporting deadline |
|---|---|---|
| Grant Agreement (GA) | Legal framework of the grant. | Project information, dates, beneficiaries, special clauses and obligations. |
| Data Sheet | Agreement-specific conditions. | Reporting periods, deadlines, payments, certificates and record retention. |
| Annex 1 — Description of the Action (DoA) | Technical commitments and work plan. | Work packages, tasks, milestones, deliverables, indicators and owners. |
| Annex 2 — Estimated Budget | Budget allocation. | Beneficiaries, cost categories, amounts and changes requiring monitoring. |
| AGA — Annotated Grant Agreement | Commission's interpretative guidance. | Articles on eligibility, personnel, records, reporting and audits. |
| Amendments and formal communications | Documented modifications or decisions. | Whether the work plan being used matches the current contractual version. |
The AGA version consulted for this guide is version 2.0, dated 1 April 2025. It is a valuable interpretative resource, but the binding document for an organisation is its signed agreement, including special conditions and subsequent amendments. For electronic reporting procedures, this guide also refers to the Commission's Online Manual, version 1.3 of May 2026.
4. The Horizon Europe reporting lifecycle: from kick-off to final payment
Implementation can be organised into six recurring stages plus a post-project record-retention stage. This framework can be adapted to 24-, 36- or 48-month projects; the actual dates are those stated in the Data Sheet.
- Contractual kick-off: read the GA, allocate responsibilities, establish cost centres and set up an evidence plan for each WP.
- Monthly monitoring: update tasks, deliverables, expenditure, staff effort and risks; approve time records where required.
- Continuous reporting: upload and update deliverables, milestones, publications, results and indicators in the Funding & Tenders Portal.
- Internal pre-close: review allocated costs, contractual dates and technical evidence; reconcile scientific and financial management records.
- Periodic reporting: prepare the technical report and each beneficiary's financial statements, followed by the coordinator's joint submission.
- Review and payments: respond to requests for clarification, acceptance or correction of the report; receive payments under the GA.
- Archiving and subsequent audits: retain evidence throughout the contractual retention period, including years after final payment.
Continuous reporting obligations do not disappear simply because the next reporting deadline is months away. The portal allows progress to be recorded throughout the project, and this information feeds into periodic reports.
5. Horizon Europe technical reporting: preparing Part A and Part B
The periodic Technical Report is usually divided into two parts, as explained in the official Funding & Tenders Portal manual.
Part A: structured data and continuous reporting
Part A brings together structured project information maintained in the management system. This may include the status of deliverables and milestones, risks, publications, dissemination, exploitation and action-specific indicators. To prevent inconsistencies, keep the records current throughout implementation rather than updating them only at the end of a reporting period.
Part B: the narrative of what actually happened
Part B explains implementation in narrative form. It should describe progress against the plan, deviations and their causes, activities not carried out or reorganised, issues encountered and corrective measures. It is prepared using the relevant template and normally uploaded as a PDF through the portal.
A strong report avoids two extremes: vague statements ('work was carried out under WP2') and endless meeting-by-meeting chronologies without outcomes. A useful structure is planned activity → work performed → evidence → result → deviation → corrective action.
Illustrative technical reporting example — WP3, experimental validation. 'During M13–M18, the stability tests scheduled under T3.2 were carried out, with 72 samples analysed in accordance with protocol v2.1. Results are documented in report D3.1 and in the dataset archived by the beneficiary. Temporary equipment unavailability delayed cross-validation by six weeks. The remaining tests were rescheduled, the risk was reported through consortium monitoring, and the activity is proposed for completion in M20, subject to applicable obligations and approvals.'
Activities, results and supporting evidence must not be invented to complete report sections. When delays occur, transparent management is generally more defensible than unsupported claims that everything was completed as planned.
6. Deliverables, milestones and work packages: what to demonstrate and how to link them
Three concepts that the funding authority treats differently are often mixed up in day-to-day project management:
- Work package (WP): a block of work defined in the Description of the Action, with objectives, tasks and responsible partners.
- Deliverable (D): an identifiable output or document that must be produced and, where applicable, submitted to the granting authority by the agreed date.
- Milestone (MS): a checkpoint for verifying significant progress or making a decision; it does not always require a separate document to be delivered.
A single deliverable can provide evidence for a milestone, while one milestone may depend on several tasks or outputs. The most practical approach is to link each contractual item to its owner, deadline, status, document version and evidence of acceptance or submission.
| Illustrative item | Deadline | Minimum technical evidence | Pre-submission check |
|---|---|---|---|
| WP2 / T2.1: protocol design | M06 | Validated protocol, version and approval record. | Check ethical decisions and dependencies. |
| D2.1: methodology report | M09 | Final PDF, owner, version and submission receipt. | Quality review and alignment with Annex 1. |
| MS3: prototype ready for validation | M15 | Test report and formal go/no-go decision. | Check against the agreed milestone criteria. |
| D4.2: evaluation report | M24 | Report, technical annexes and verifiable results. | Check deadlines, confidentiality and uploaded version. |
This fictional example does not replace the actual deliverable codes, deadlines or dissemination levels in a real GA. To build a detailed technical breakdown, see our guide to research WBS and work packages.
7. Financial reporting: what are eligible costs under Horizon Europe?
Under actual-cost grants, an expense booked in the accounting system is not automatically eligible. As a general rule, actual costs must be incurred within the permitted period, be necessary for the action, be identifiable and recorded in line with usual accounting practices, be reasonable and verifiable, and comply with applicable contractual and legal obligations. Exceptions and category-specific provisions exist, for example for certain final reporting costs.
| Common category | Examples | Evidence worth retaining |
|---|---|---|
| A. Personnel | Employees and other personnel categories allowed by the GA. | Contracts, payroll and employment costs, daily-rate calculation, effort records and approvals. |
| B. Subcontracting | External implementation of action tasks under GA conditions. | Business justification, selection procedure, contract, invoice and resulting work. |
| C. Purchases | Travel and subsistence; equipment; other goods, works and services. | Invoices, payment evidence where relevant, procurement decisions, proof of use and depreciation calculations where applicable. |
| D. Other cost categories | Authorised special categories, such as certain internally invoiced goods and services or financial support to third parties. | Methodology and evidence required by the category and call. |
| E. Indirect costs | Overheads that cannot be assigned individually and are generally covered by a flat rate. | Correct eligible direct-cost base; individual overhead invoices are generally not required. |
Cases that often cause uncertainty
- VAT: may be eligible when it is not recoverable, subject to GA conditions; deductible VAT is normally ineligible.
- Equipment: the full purchase price cannot always be declared. Eligible costs may depend on depreciation, time and actual use, unless the agreement permits another option.
- Costs outside the period: an expense does not become eligible merely because it is paid later or is useful to the project.
- Estimated costs: a budget forecast is not the same as an actual cost incurred; unit-cost and other funding forms have their own rules.
- Double funding: the same item must not be charged twice in a way incompatible with the applicable rules.
The detailed structure and specific conditions are set out in Article 6 of the Annotated Grant Agreement.
8. Timesheets and monthly declarations: substantiating personnel costs
Personnel is often one of the largest budget categories and one of the most closely scrutinised during an EU research project financial audit. Under Horizon Europe actual-cost grants that claim personnel costs, the records must reflect the day-equivalents actually worked on the action.
Two ways to substantiate effort
- Monthly declaration of day-equivalents signed by the person working on the project and their supervisor or responsible manager, in accordance with the applicable procedure.
- Reliable alternative time-recording system, paper-based or digital, documenting at least the time worked on the action. Records must be dated and approved at least monthly through an auditable procedure.
The Commission permits digital systems with electronic signatures or electronic approval where user management is secure and a verifiable transaction history exists. An editable spreadsheet without controls, history or approvals is not enough.
What each record should contain
- The person's name, beneficiary organisation and unambiguous project reference.
- Month and year, day-equivalents or actual hours worked, and the conversion method where relevant.
- A comprehensible reference to tasks or work packages.
- Identity of the employee and supervisor approving the record, plus approval dates.
- Consistency with leave, absences, contracts, other projects and working calendars.
Worked example: personnel-cost calculation
Consider a full-time employee over a 12-month reference period with €64,500 in eligible employment costs and no special circumstances affecting the denominator. As a simplified illustration:
This calculation does not automatically authorise the declaration of 80 days. Valid records must exist, the work must relate to the action, and the applicable maximum number of declarable days per person, period, working-time arrangement and combination of grants must be respected. For part-time work, changes in working time, special leave or periods shorter than 12 months, the denominator and calculation must be adjusted under GA Article 6.2.A.
As a reference point, 215 days is a general annual parameter for a full-time employee; it does not mean that all projects can charge this number of days or that annual salary can always be divided by 215 without adjustments. Where applicable and subject to approval, Horizon Europe also provides for personnel unit costs under a different methodology.
9. Documenting travel, equipment, purchases and subcontracting
Eligibility is not demonstrated merely by attaching an invoice. Retain the full chain: project need → purchasing decision → selection procedure → contract → delivery or performance → accounting record → allocation to the action. The level of scrutiny depends on the cost category, amount and the beneficiary's rules.
Travel and conference participation
Link each trip to a project task: presenting results, attending a consortium meeting, carrying out an experiment or performing dissemination activities. Keep the purpose, participants, programme, relevant supporting documents and invoices, and apply approved travel and subsistence rules. A conference may be scientifically valuable without automatically being chargeable to the grant if the connection cannot be substantiated.
Equipment and infrastructure
In many cases, the eligible amount is the depreciation corresponding to the period and proportion of actual project use, not the full purchase invoice. Record the purchase date, accounting policy, useful life, eligible period and basis for measuring use. Check explicitly whether the GA permits full purchase costs or specific cost units for the equipment concerned.
External services and subcontracting
Subcontracting means entrusting a third party with the performance of an action task; it should not be confused with an ordinary purchase of ancillary goods or services. Verify that the activity was foreseen or properly notified, procurement requirements were met, and evidence exists of appropriate selection, absence of conflicts of interest, reasonable cost and work actually performed.
Where comparable offers, competitive processes or best-value-for-money criteria are required, the audit trail for selection is just as important as the invoice. National public procurement rules may also apply to certain beneficiaries.
10. Horizon Europe direct and indirect costs: a 25% worked example
As a general rule, Horizon Europe indirect costs are calculated using a flat rate of 25% of the eligible direct costs included in the calculation base. The rate is not necessarily applied to the total budget: subcontracting, financial support to third parties and categories already including indirect costs are among the exclusions.
Illustrative cost declaration. A university declares €24,000 of personnel costs, €6,000 of eligible equipment depreciation, €2,000 of eligible travel and €10,000 of eligible subcontracting. Assuming all GA conditions are met:
| Cost item | Amount | Included in indirect-cost base? |
|---|---|---|
| Personnel | €24,000 | Yes |
| Equipment depreciation | €6,000 | Yes |
| Travel | €2,000 | Yes |
| Subcontracting | €10,000 | No |
| Indirect-cost base | €32,000 | Personnel + equipment + travel |
| Indirect costs (25%) | €8,000 | €32,000 × 0.25 |
| Total illustrative eligible costs | €50,000 | €42,000 direct + €8,000 indirect |
Important: the €50,000 in this example represents eligible costs, not necessarily the amount the European Union will pay. The contribution depends on the funding rate and maximum grant amount applicable to the action and beneficiary. Furthermore, if the €6,000 equipment depreciation were ineligible, it could not be included in the indirect-cost base either.
The flat rate simplifies overhead substantiation: individual invoices for each overhead expense are normally unnecessary, but the direct costs that generate the calculation base must still be shown to be eligible.
11. Horizon Europe financial reporting: submitting the financial statement
Horizon Europe financial reporting covers the costs declared by each beneficiary—and affiliated entities, where applicable—for the relevant reporting period. The contractual reporting schedule is the starting point. As a general rule, the consortium submits the periodic report within 60 days after the end of the reporting period, unless specific conditions provide otherwise.
- Extract and reconcile: obtain costs from the accounts and payroll, and check their allocation by beneficiary, reporting period and cost category.
- Validate eligibility: review general eligibility criteria, specific restrictions and supporting documents.
- Calculate personnel and indirect costs: apply the relevant day-equivalent methodology, valid rates and applicable 25% calculation base.
- Complete the Financial Statement: each beneficiary enters its cost items and, where required, explanations of resource use or detailed cost tables.
- Sign and forward: the authorised financial signatory (FSIGN) electronically validates the statement through the portal workflow.
- Coordinator review: the coordinator checks the consistency of partner reports and submits the combined reporting package to the granting authority.
In collaborative actions, each partner remains responsible for the quality of its own data and evidence. The coordinator must ensure that the overall report is consistent, but cannot replace the accounting systems or internal controls of individual institutions.
If an error is identified in a previously submitted period, the portal provides for correction mechanisms or adjustments, subject to specific conditions. It is not advisable to retrospectively alter the methodology used merely to obtain a different result. The reporting guidance from Austria's FFG agency explains the administrative steps and their scope.
12. EU R&D project audits: when is a CFS required and what do auditors review?
A common misconception is to treat the Certificate on the Financial Statements (CFS) as though it were the only audit that can occur. It is important to distinguish this financial certificate from checks, reviews and audits that the Commission or an appointed audit body may undertake.
Above what amount is a CFS mandatory?
For standard Horizon Europe cost-based grants, the general threshold is €430,000 in EU contribution requested by each beneficiary or affiliated entity over the entire project, subject to the applicable rules and exceptions. The relevant contribution includes the appropriate indirect costs. This must not be confused with the €325,000 figure associated with other programme rules or Horizon 2020.
As a general rule, where required, the CFS is submitted with the final report and issued by a qualified independent auditor using the prescribed model. The threshold is checked separately for each beneficiary and affiliated entity. Special arrangements may apply, for example to organisations with a low-risk Systems and Process Audit (SPA) assessment. Always consult the Data Sheet and the beneficiary's circumstances. Under lump-sum grants, a CFS is not used to substantiate actual costs.
What a financial audit examines
- Consistency between charged expenditure, accounting ledgers and eligible periods.
- Personnel-cost calculations and monthly effort records.
- The link between charged costs and work actually carried out.
- Procurement procedures, invoices, receipts and selection criteria.
- VAT treatment, depreciation, subcontracting and exclusions from indirect-cost calculations.
- Potential double charging, inconsistent rates or costs unrelated to the action.
- Completeness, authenticity and accessibility of the supporting records.
A CFS does not guarantee that no subsequent review will take place. The competent authority can carry out additional checks and, where ineligible costs are identified, impose corrections or recoveries in accordance with the agreement.
How long must supporting documentation be retained?
The AGA's general rule is to retain evidence for at least five years after payment of the final balance. For certain low-value grants of up to €60,000, the period may be three years. The retention period can be extended when audits, investigations, litigation or national rules require longer preservation. Do not confuse the project's technical completion date with the date from which contractual retention obligations are counted.
13. How to conduct an internal pre-audit before receiving an audit request
An internal pre-audit is a preventive review that reproduces the questions an auditor is likely to ask. It does not mean duplicating every document; it means knowing where the evidence is located, who validates it and which cost or activity it supports.
Step 1: select a representative sample of transactions
Choose high-value expenses and sensitive cases: personnel working across several projects, exceptional travel, subcontracting, shared equipment, contractual changes and costs incurred near the end of a reporting period. Check that each transaction can be reconstructed without relying on the memory of one individual.
Step 2: test traceability in both directions
Follow the trail from the accounts to the activity ('Why was this cost charged?') and the reverse trail from the WP to the supporting evidence ('Which records and costs substantiate the work carried out?'). An invoice may be correctly archived, but if it cannot be linked operationally to a task or deliverable, the audit trail is weaker.
Step 3: validate restrictions and exceptions
Verify that costs fall within the eligible period, rates and conversions can be reproduced, nothing has been charged twice, effort records are approved and contractual exceptions are documented. Budget or work-plan changes do not always require a formal amendment, but the team must identify when an amendment is compulsory.
Step 4: maintain a findings register
Each finding should capture the issue, affected amount or WP, risk, owner, missing documentation, decision and closure date. It is better to correct a problem detected internally than discover it after the reporting period can no longer be amended through normal procedures.
Recommended quality control: a cross-functional review by researchers, project managers, finance staff and human resources can reveal inconsistencies that no single unit would usually detect in time.
14. Ten common mistakes in Horizon Europe project reporting
- Preparing all evidence at the end. Missing contemporaneous records can be difficult to reconstruct.
- Confusing a paid expense with an eligible cost. The rules require more than an invoice.
- Using timesheets without reliable validation. Declarations must follow the accepted method, timing and controls.
- Allocating effort using unsupported estimated percentages. Reported effort must be linked to actual work and an appropriate methodology.
- Applying the 25% rate to subcontracting or other excluded categories. Overstating the overhead base distorts the financial report.
- Declaring the full cost of equipment where depreciation is required. Eligibility depends on the method and GA conditions.
- Submitting a deliverable without version control. The final document must match the approved and uploaded version.
- Ignoring a material technical deviation. The report should explain its causes, impact and corrective measures.
- Confusing Horizon 2020 rules with Horizon Europe rules. Some thresholds and calculation methods have changed.
- Treating a lump-sum grant as an actual-cost project. Evidence that the agreed work was performed plays a different, central role.
Other common difficulties include poor coordination between consortium partners, incorrectly assigned signatory permissions and evidence stored in personal folders without proper access and retention procedures.
15. Reporting timetable: organising the 60-day submission window
The following is an operational proposal, not an additional deadline imposed by the EU. Its purpose is to prevent teams from beginning the technical report and financial close only after the reporting period has ended.
| When | Suggested action | Typical owner |
|---|---|---|
| 60–30 days before period end | Review outstanding deliverables, risks, missing evidence and the work plan. | Technical coordination and WP leaders. |
| 30–1 days before period end | Check effort records, documentation, significant expenses and each partner's status. | Researchers, finance and HR. |
| Day 0: reporting period ends | Set the accounting cut-off and consolidate the list of transactions in the period. | Financial management. |
| Days 1–15 | Reconcile accounts and gather technical contributions from partners. | Beneficiaries and WP leaders. |
| Days 16–30 | Draft Part B, financial statements and explanations of resources used. | Coordination and finance teams. |
| Days 31–45 | Cross-check narratives and figures, obtain internal signatures, quality-check and resolve findings. | FSIGN, coordination and responsible managers. |
| Days 46–60 | Final validation, coordinator submission and archiving of the submitted file. | Consortium coordination. |
Where the GA sets a different timetable, the contractual deadlines always prevail. Do not confuse this reporting submission window with individual deliverable deadlines, which may fall in different project months.
16. Example of an audit-ready traceability matrix
A simple matrix connects technical commitments with evidence and financial transactions without forcing an artificial one-to-one relationship between an invoice and a deliverable. It can serve as a monthly tracking template and an evidence index for an internal pre-audit.
| Field | Fictional example | What it verifies |
|---|---|---|
| Project / beneficiary | HE-DEMO-01 / University A | Identification of the grant file. |
| Period and WP | RP1, M01–M18 / WP3 | Contractual context. |
| Task / deliverable | T3.2 / D3.1 | Alignment with Annex 1. |
| Responsible person | Research lead for validation | Accountability and ownership. |
| Status and date | Completed / M17 | Verifiable timeline. |
| Technical evidence | Final report v3 + minutes + dataset | Proof of work performed. |
| Financial item | Personnel: ref. P-003; equipment: ref. E-008 | Link to accounts and charged costs. |
| Time record | Approved monthly declarations | Support for declared personnel expenditure. |
| Location and version | Institutional repository / archive ID | Retrieval, integrity and review. |
| Comments / audit | No findings; approval 21/04/2026 | Control history. |
This matrix is an organisational tool, not a compulsory official form. For large consortia, consider additional access controls, document classification, unique identifiers, retention rules, financial owner and formal acceptance status.
17. Horizon Europe reporting checklist before submission
- We have checked the current GA, Data Sheet and annexes, including all amendments.
- We know whether the grant uses actual costs, unit costs or a lump sum, and which special rules apply.
- Part A in the portal contains the continuous-reporting information that should be current.
- Deliverables and milestones for the period are up to date, with identifiable evidence and versions.
- Part B explains implementation, deviations, risks and corrective measures in a verifiable way.
- Monthly effort records have been approved under the applicable methodology.
- Reconciliation of payroll, contracts, accounting data and charged personnel is documented.
- Purchases, travel and subcontracting have supporting evidence, a project rationale and verifiable selection procedures.
- Depreciation methodology and VAT treatment have been checked where relevant.
- The 25% indirect-cost base excludes categories that must not be included.
- There are no double-charged expenses or overlapping eligible days.
- Financial statements from partners and affiliated entities have been reviewed and signed.
- We have checked whether a CFS is required based on each entity's threshold and conditions.
- The coordination team has reconciled the technical narrative with the financial figures.
- The final reporting package, submission receipt and version history have been archived.
18. Tools for organising grant reporting without duplicating work
Robust reporting typically combines several layers: accounting and HR systems for financial and personnel data; the Funding & Tenders Portal for official submission; institutional repositories for safeguarding documents; and an operational project workspace for coordinating tasks, deadlines, risks and deliverables.
For scientific projects involving multiple teams or institutions, the challenge is not only adding up costs but bringing scattered information together: who was responsible for D2.1, where its approved version is stored, which activity was delayed, who must provide specific evidence and which dependency affects the next report.
Tools such as KaiperKit can help organise this scientific work layer by connecting projects to tasks, deadlines, team members, documentation, milestones and funding opportunities. That can make it easier to prepare and locate technical evidence ahead of reporting.
From scientific planning to a traceable reporting file
If your group coordinates European projects, each research commitment should have a clear owner, deadline and contextual documentation. See how KaiperKit connects projects, tasks and documents, while keeping accounting systems and the EU portal as the official sources for financial information and submissions.
Important: research management software should not be confused with a certified Horizon Europe audit solution. KaiperKit does not by itself replace accounting, legally required time-recording systems, CFS issuance or submission of reports to the European Commission.
To organise a research team or consortium, see our guide to R&D project management and our introduction to research PPM.
19. Frequently asked questions about Horizon Europe project reporting
How long do beneficiaries have to submit a Horizon Europe periodic report?
As a general rule, the consortium must submit its periodic report within 60 days after the reporting period ends. The exact deadlines, duration of each reporting period and special conditions are stated in the Grant Agreement and Data Sheet.
Are timesheets mandatory for every Horizon Europe project?
No. Under actual-cost grants claiming personnel costs, effort must be substantiated using valid monthly declarations of day-equivalents or a reliable alternative time-recording system. Lump-sum projects do not declare their actual costs to receive payment, although other documentary or control obligations may remain.
Can a researcher working on several projects have their effort declared on each grant?
Yes, provided the allocation reflects real, verifiable work and complies with the limits on declarable days and each grant's rules. Overlapping time, double charging and records inconsistent with other work must be avoided.
What is the difference between a deliverable and a milestone?
A deliverable is an identifiable product or result that the project must produce and, where appropriate, submit. A milestone is a checkpoint for assessing progress or making a decision. Both are governed by the commitments in Annex 1.
What percentage of indirect costs does Horizon Europe allow?
The general rule is 25% of the eligible direct costs included in the calculation base. Categories such as subcontracting, financial support to third parties and items already including indirect costs are excluded. The detailed calculation depends on the GA.
At what amount must a Certificate on the Financial Statements be submitted?
For standard cost-based Horizon Europe grants, the general threshold is €430,000 in EU contribution requested per beneficiary or affiliated entity across the entire project, subject to exceptions and specific conditions. The CFS is generally submitted with the final report. Lump-sum grants do not use a CFS to verify actual costs.
Can the full invoice value of equipment be charged?
Not necessarily. The usual treatment may require charging only the depreciation corresponding to eligible months and eligible use. Exceptions exist when the agreement expressly authorises full-cost options or other specific cost methods.
What happens if a deliverable is delayed?
The delay, its causes, consequences and corrective measures should be documented; continuous reporting should be updated and the issue included in the periodic report where relevant. If the change affects the agreement in a way that requires an amendment, the appropriate formal process must be followed.
Can an audit take place after the project has ended?
Yes. Supporting evidence must normally be retained for years after payment of the final balance, and the competent authorities can carry out checks and audits under the contract and applicable rules.
Can technical and financial reports be submitted directly from an external tool?
The European Commission's Funding & Tenders Portal is the official submission channel. External tools may help prepare evidence, tasks, calculations or drafts, but should not be presented as substitutes for the official process without a formal, verifiable integration.
20. Official sources and resources to verify requirements
This guide draws on documentation available as of October 2026. Requirements depend on the action and may be updated. For questions with financial consequences, the decisive references are the specific grant agreement and guidance from the granting authority.
- European Commission. EU Grants: Annotated Grant Agreement (AGA), version 2.0, 1 April 2025. Articles 6, 20, 21 and 24–25.
- European Commission. Funding & Tenders Portal Online Manual, version 1.3, May 2026. Sections on continuous and periodic reporting.
- European Research Executive Agency. Horizon Europe — Grants & Reporting.
- European Commission. Lump sum funding in Horizon Europe — Guidance.
- FFG (Austria). Personnel costs in Horizon Europe.
- FFG (Austria). Certificate on the Financial Statements (CFS) in Horizon Europe.
- FFG (Austria). Indirect costs in Horizon Europe.
- European Commission. Personnel unit costs — Horizon Europe.
Editorial note: all amounts and examples are educational. They do not establish the eligibility of any particular expense and cannot replace advice from a European projects office or a beneficiary's financial manager.